Laying parquet on plywood

For laying parquet boards you need basic knowledge in construction. The parquet itself is made of 3 layers, each of which has its own function. If the surface is properly finished, the floor will become strong and beautiful.

Preparatory work when installing parquet on plywood

Before laying, you need to perform several cooking steps:

  1. Marking the territory. We put the squares directly on the floor. We do this so that no seams appear between the material.
  2. To align the squares, use a jigsaw and a hacksaw. You can reduce the size of the materials, if necessary.
  3. We use insulation to keep the floor warm. It can be installed both under plywood and between plywood and flooring. Mineral wool is suitable for warming a wooden floor.

Important nuances at work

There are several conditions that must be met in order to properly lay a parquet board:

  1. Make a perfectly flat surface. You can use sandpaper or a self-leveling compound.
  2. Plywood must be protected from water. To check it for moisture, we cover the material with a PVC film. If drops or vapors do not form on it, then the material does not absorb water. If appeared, it must be treated with protective solutions. Now we are waiting for drying.
  3. Bonding must be rigid. It is necessary to firmly press the parquet board to the base.
  4. You should pre-select the varnish to cover the floorboard.
  5. In the process, you may experience problems with outlets and borders. With basic knowledge of construction, it will be possible to mount the parquet without affecting these objects.

Important! Water is the main enemy of such material. High humidity will rot. But excessive dryness will also cause problems. Parquet begins to dry out and crumbles.

Installation of parquet board on plywood: step by step

The work process consists of several stages:

  1. We mount parallel logs. Between the bars can not leave large gaps. Parquet board should fit snugly. If there is a small gap, we add a piece of parquet into it, cutting it off with a hacksaw.
  2. Choose 3 control points. We install wedges made of wood to create a flat surface.
  3. Through the wedges and bars we make holes. Self-tapping screws are inserted into them.
  4. You can stack the cooked material.
  5. The last step is coverage. It is recommended to make a varnish surface.

Anyone can do such a job. The main thing is to adhere to the instructions and strictly follow the rules.